Utility Tariff Analysis · Updated September 2026

Duke Energy's 50 MW Large-Load Generic Docket: What It Means for AI Data Center Siting in South Carolina

50 MW or greater additions are covered by a generic docket Duke Energy's South Carolina utilities agreed to open, evaluating existing rate schedules, service regulations, line-extension policy and interconnection rules specifically for 50 MW-plus load additions, alongside updated Service Regulations already approved to formally account for large-load customers.

South Carolina at a glance: industrial power about 7.3¢/kWh (EIA-based, indexed to April 2026) · grid queue about 30 months · data center equipment tax exemption: available. Indicative figures from the SCR AI Build Configurator v1.4.0.

South Carolina AI data center power map: Duke Energy's 50 MW Large-Load Generic Docket large-load tariff

Duke Energy's 50 MW Large-Load Generic Docket

SC

Duke Energy Carolinas / Duke Energy Progress

2025-172-E; 2025-154-E; 2026-138-E

Regulatory docket / filing reference

50 MW or greater additions

Who the tariff applies to

50 MW or greater additions are covered by a generic docket Duke Energy's South Carolina utilities agreed to open, evaluating existing rate schedules, service regulations, line-extension policy and interconnection rules specifically for 50 MW-plus load additions, alongside updated Service Regulations already approved to formally account for large-load customers.

Also active in South Carolina: South Carolina's stipulation process — agreeing to the generic docket structure before rates are finalized — has become a template other Duke Energy jurisdictions, including North Carolina, are now following.

Figures compiled from the Edison Electric Institute's "Large Load Projects and Tariffs" (September 2026) member-company summary and public regulatory filings. Confirm current tariff terms directly with Duke Energy Carolinas / Duke Energy Progress and the relevant state public utility commission before relying on any figure for a capital decision.

Weighing South Carolina against another state or a Canadian province with a different rate and interconnection picture entirely? Run both sides of the comparison through our licensed AI data center cost configurator — it applies each jurisdiction's actual power rate, tax treatment and large-load tariff rules to the same seven build configurations.

Duke Energy’s South Carolina docket is still working through the generic proceeding process; our crypto data center in BC has already been through that kind of rate design decision and is running today.

South Carolina at a glance: large-load tariff threshold, docket and who it applies to Duke Energy's 50 MW Large-Load Generic Docket: Duke Energy's 50 MW Large-Load Generic Docket: What It Means for AI Data Center Siting in South Carolina

Model This State on Your Own Site

Every figure above comes from the same power-cost and tariff dataset behind the SCR AI Build Configurator — a licensed, embeddable widget that models seven data center build configurations against all nine Canadian provinces and all 50 US states plus DC, returning capital expenditure by line item, energy cost, revenue by commercial structure, EBITDA and payback.

LicencePrice (CAD)Who it suits
Standard$4,000 / domain / yearAdvisors who need three lease-model configurations and a clipboard summary
Pro$10,000 / domain / yearConsultants who send CSV deliverables to clients and want all seven configurations
EnterpriseFrom $25,000 / year, up to 3 domainsDevelopers and EPC firms who want the model on their own cost basis with attribution removed

Not ready for an annual licence? A one-time Site Screening Report ($950, one site) runs the same model for a single build without embedding anything.

Model a South Carolina data center build in the SCR AI Build Configurator: CapEx, power cost, EBITDA and payback Model This State on Your Own Site: Duke Energy's 50 MW Large-Load Generic Docket: What It Means for AI Data Center Siting in South Carolina

Compare South Carolina With Nearby States

Large-load rules change sharply at state lines. See how the neighbouring utilities handle data center and high-density loads before you shortlist a site.

Frequently Asked Questions

What is Duke Energy's 50 MW Large-Load Generic Docket?

50 MW or greater additions are covered by a generic docket Duke Energy's South Carolina utilities agreed to open, evaluating existing rate schedules, service regulations, line-extension policy and interconnection rules specifically for 50 MW-plus load additions, alongside updated Service Regulations already approved to formally account for large-load customers.

Why did Duke Energy Carolinas / Duke Energy Progress introduce this large-load structure?

To ensure the cost of new generation, transmission and distribution infrastructure built to serve very large customers, chiefly hyperscale data centers, is paid for by those customers rather than spread across the general rate base of residential and small commercial ratepayers.

What else should data center developers know about South Carolina?

South Carolina's stipulation process — agreeing to the generic docket structure before rates are finalized — has become a template other Duke Energy jurisdictions, including North Carolina, are now following.

Does this tariff replace South Carolina's standard commercial and industrial rates?

No. Duke Energy's 50 MW Large-Load Generic Docket sits above Duke Energy Carolinas / Duke Energy Progress's standard commercial and industrial rate schedules and applies specifically to customers that meet or exceed the large-load threshold described above. Smaller commercial and industrial loads continue to be billed under existing rate schedules.

How can I model a South Carolina data center build against this tariff and other states?

The SCR AI Build Configurator applies South Carolina's power cost, tax treatment and large-load tariff rules alongside all other US states and Canadian provinces, so a South Carolina scenario can be compared line-by-line against any alternative site.