Customers with at least 70 MW of firm load and an 80 percent average monthly load factor qualify for Entergy Louisiana's dedicated Large Load, High Load Factor Power Service Rate, which bundles minimum-take and load-factor requirements into a single large-customer class.
Also active in Louisiana: Entergy Louisiana is serving what may be the single largest data centre commitment on this list: a $50 billion, 5 GW planned Meta campus in Richland Parish projected to deliver about $2.65 billion in savings to existing customers over 20 years, alongside a $10 billion Hut8 campus in West Feliciana Parish.
Named Projects Already Underway
| Customer | Location | Details |
|---|---|---|
| Meta | Richland Parish, LA | $50 billion, 5 GW planned data centre project, projected to deliver approximately $2.65 billion in customer savings over 20 years |
| Hut8 | West Feliciana Parish, LA | $10 billion data centre campus, initially 330 MW with potential to expand to 1,000 MW |
Figures compiled from the Edison Electric Institute's "Large Load Projects and Tariffs" (September 2026) member-company summary and public regulatory filings. Confirm current tariff terms directly with Entergy Louisiana and the relevant state public utility commission before relying on any figure for a capital decision.
Weighing Louisiana against another state or a Canadian province with a different rate and interconnection picture entirely? Run both sides of the comparison through our licensed AI data centre cost configurator — it applies each jurisdiction's actual power rate, tax treatment and large-load tariff rules to the same seven build configurations.
Model This State on Your Own Site
Every figure above comes from the same power-cost and tariff dataset behind the SCR AI Build Configurator — a licensed, embeddable widget that models seven data centre build configurations against all nine Canadian provinces and all 50 US states plus DC, returning capital expenditure by line item, energy cost, revenue by commercial structure, EBITDA and payback.
| Licence | Price (CAD) | Who it suits |
|---|---|---|
| Standard | $4,000 / domain / year | Advisors who need three lease-model configurations and a clipboard summary |
| Pro | $10,000 / domain / year | Consultants who send CSV deliverables to clients and want all seven configurations |
| Enterprise | From $25,000 / year, up to 3 domains | Developers and EPC firms who want the model on their own cost basis with attribution removed |
Not ready for an annual licence? A one-time Site Screening Report ($950, one site) runs the same model for a single build without embedding anything.