Named Projects Already Underway
| Customer | Location | Details |
| Quantica Infrastructure | Montana | 1,000 MW data center project; initial 500 MW phase to begin as early as 2026, full expansion by 2030 |
| Atlas Power Group | Butte, MT | 150 MW data center project, with 75 MW available in 2026 |
Figures compiled from the Edison Electric Institute's "Large Load Projects and Tariffs" (September 2026) member-company summary and public regulatory filings. Confirm current tariff terms directly with NorthWestern Energy and the relevant state public utility commission before relying on any figure for a capital decision.
Weighing Montana against another state or a Canadian province with a different rate and interconnection picture entirely? Run both sides of the comparison through our licensed AI data center cost configurator — it applies each jurisdiction's actual power rate, tax treatment and large-load tariff rules to the same seven build configurations.
Curious what a working small-scale operation actually looks like day to day rather than a filed tariff docket? Our own crypto data center in British Columbia runs on a very different rate structure than NorthWestern Energy’s proposed tariff, but the same siting logic applies.